15 Dec
2021
15 Dec
'21
8 p.m.
Hi Angela I have a question about policy ripe-725. On Wed, 15 Dec 2021 at 13:22, Angela Dall'Ara <adallara@ripe.net> wrote:
Q. When was the waiting list implemented? Q. When was the allocation size dropped to /24?
A. The waiting list was introduced and the IPv4 allocation size reduced from a /22 to /24 on 19 September 2019, as per ripe-725: https://www.ripe.net/publications/docs/ripe-725#51bis
Are you saying section 5.1bis of ripe-725 became active as section 5.1 on 19 Sept 2019? This textual change in the policy did not take place in ripe-730, published on 20191010. But waited until ripe-733 published on 20191125. cheers denis